Planning » Application Summary

Help with this page (opens in a new window)

17/03725/FUL | Erection of Waste Management Facility comprising Anaerobic Digestion Plant for the processing of biodegradable waste (maximum feedstock of 65,000 tonnes per annum), vehicular access, combined heat and power unit, gas network entry plant, propane tanks, auxiliary flare plant, concrete apron, stores building, site office, bund and associated infrastructure as amended 27.10.17 and 17.11.17 | Land At Beeley Wood Recycling Village 2 Beeley Wood Lane Sheffield S6 1QT
Reference 17/03725/FUL
Alternative Reference PP-06256356
Application Received Fri 25 Aug 2017
Application Validated Thu 31 Aug 2017
Address Land At Beeley Wood Recycling Village 2 Beeley Wood Lane Sheffield S6 1QT
Proposal Erection of Waste Management Facility comprising Anaerobic Digestion Plant for the processing of biodegradable waste (maximum feedstock of 65,000 tonnes per annum), vehicular access, combined heat and power unit, gas network entry plant, propane tanks, auxiliary flare plant, concrete apron, stores building, site office, bund and associated infrastructure as amended 27.10.17 and 17.11.17
Status Decided
Decision Grant Conditionally
Decision Issued Date Wed 20 Dec 2017
Appeal Status Unknown
Appeal Decision Not Available

There are 99 documents associated with this application.

There are 0 cases associated with this application.

There is 1 property associated with this application.

an idox solution (opens in a new window)